toggle menu

What We Do Best

Success starts with solid engineering.

We embrace the opportunity to provide fit-for-purpose quality solutions tailored to our clients’ needs. Try us.

Projects MOC Well Pads Pipelines OPP Innovation Seminars
engineering flow chart

Projects


We’re awesome at engineering projects. This means everything from cradle to grave, including engineering, design, project management, project services, construction support, operations support, and as-building.

Learn More
management of change graph

Management of Change


MOC projects have been the backbone of our company for more than a decade, and make up 40% of our work. Needless to say, we're pretty good at it by now. Custom-built solutions is what it's all about.

Learn More
well pad cfd

Well Pads


Well pads aren’t complicated, but each one is unique. We have the creativity and sand management and operational expertise to design the optimal solution for your well pad. You could say we're well-positioned.

Learn More
pipelines graphic

Pipelines


We're working together with industry professionals to help execute operation excellence through pipeline engineering design and leak detection technologies.

Learn More
overpressure protection graphic

Overpressure Protection


OPP is your last line of defense against possible pressure equipment failure. It serves to protect equipment, prevent unsafe operations, prevent production loss, and ensure your people get home safely.

Learn More

Innovation


We decided to take engineering to the next level. Computational fluid dynamics is process engineering on steroids, where innovations and ideas can be tested in days rather than weeks or months. We can simulate multi-phase flows, slurries and mixtures, supercritical fluids, porous media, granular transport, and more.

Learn More
seminars graphic

Seminars


Led by industry experts with years of experience and a wealth of field-based knowledge, our seminars are the perfect way to keep current in your field. If you are an engineer or a senior operations professional, sign-up now to attend one of our seminars.

Learn More

Safety | People | Integrity | Passion | Experience | Endurance